
Industrial parks
firm power for many tenants without waiting for grid reinforcement.
Distributed energy
A transportable, containerised generation package installed close to the people who use the power. It makes electricity and, where the site can use them, heat and cooling.

Why a microturbine and not a genset: the V70 and V200 run on biogas from farms, agro-industry and sewage plants, spin on a single shaft on air bearings with no lubricating oil and no radiator, and are inspected every 8,000 h (design target).
Read why →Generating on site keeps your energy cost in your own hands and takes you out of the grid queue.
How far Brazil's spot power price rose in one hot afternoon: from R$57 to R$1,437/MWh, peaking at 7 pm (15 Oct 2026).
Source: CCEE via Canal Solar (Oct 2026)
Greater São Paulo has no margin for new grid connections until 2030; Pecém until 2031.
Source: ONS via DCD/Folha (Jun 2026)
Paid by distributors in 2025 as compensation for supply failures.
Source: ANEEL (Apr 2026)
Customers lost power in São Paulo during the December 2025 storms.
Source: Enel via InfoMoney (Oct 2026)
Transmission towers have come down in Brazil since July 2026 because of El Niño.
Source: ONS via Folha (22 Oct 2026)

firm power for many tenants without waiting for grid reinforcement.

power and air conditioning from the same fuel.

electricity plus the heat the process already uses.

continuity for loads that can't go down.

local backup nodes and reinforcement at weak points of the grid.

power next to the racks while the grid connection is pending.
Hundreds of kW
For smaller loads, with redundancy inside the block itself.
MW range
For megawatt loads, with cooling and heat from the same exhaust. Several modules side by side serve larger loads.
See the 2 MW module →load, fuel, space and connection.
number of blocks, redundancy, heat and cooling.
the blocks arrive assembled and are hooked up on site.
commissioning and follow-up by Rengia.

| Fuel | Status |
|---|---|
| Natural gas | Standard |
| Biogas / biomethane | Standard |
| LPG | Standard |
| Ethanol | On request |
| Syngas | On request |
| Hydrogen | Under evaluation |
Availability varies by equipment. The 2 MW-class block is currently specified for pipeline natural gas.
Hydrogen: in development — already accepting up to 30% hydrogen blended with natural gas (2 MW-class block).
In Brazil, qualified cogeneration, biogas and biomass can count as distributed minigeneration up to 5 MW.
Source: Law 14,300/2022
Send us the load, the fuel you have and the address. We'll do the first analysis.