A gas or diesel genset costs less per installed kW. The question that matters is what each one costs, and what each one delivers, over the years it runs 24 hours a day. The answer changes with the size of the load and with the gas on site. That is why this page covers the microturbines and the 2 MW module separately.

Industrial plant with stacks at dusk

The genset is cheaper to buy

It is true, and it is the first number in any quote. But the price per kW measures a single day in the equipment's life: the day it is bought. In the years that follow, the bill includes fuel, maintenance stops, parts, and everything the site keeps buying from outside, such as boiler steam and electricity for the chillers.

What weighs over the equipment's life

01

Maintenance stops

Running 24/7, a gas genset changes oil and filters 4 to 17 times a year (every 500–2,000 h). An industrial turbine stops for inspection every 4,000 h, about twice a year. The V70 and V200 microturbines have no lubricating oil and are inspected every 8,000 h.

Design target

02

Maintenance cost per kWh

In the US Department of Energy fact sheets, maintenance of 65 to 200 kW microturbines costs 1.7–1.9 US cents per kWh generated. For 35 to 250 kW gas engines it costs 2.2–3.0.

03

Energy the site no longer buys

The turbine's exhaust heat drives an absorption chiller, which makes chilled water without an electric compressor, and still produces steam or hot water. Every kW of cooling made this way is one kW less of electric chiller on the bill.

The price per kW tells you what it costs to buy. The cost per kWh delivered, plus the heat and cooling the site no longer buys, tells you what it costs to run.

Which turbine for which load

CriterionV70 and V200 microturbines2 MW CCHP module
Output70 kW and 200 kW per unit; several in parallel1.4–1.6 MWe net per module; several side by side
Gas on siteBiogas, biomethane, natural gas and LPGNatural gas from a pipeline or the distribution network; biomethane within the network specification
Where it pays off mostBiogas from farms, agro-industry and sewage; hotels, hospitals and retail; telecomIndustry with steam demand; shopping centres, hospitals and campuses; data centers; microgrids; distribution utilities
Heat and coolingClean exhaust at ~190 °C: hot water, digester heating, absorption cooling~1.7–1.9 MWt above 100 °C and 137–333 kW of absorption cooling
StatusV70 in assembly and testing; V200 in development, expected ~2027From stock in Brazil: ~60 days on a ready site; 3–9 months for new orders

Design targets. Lead times indicative · stock confirmed at order.

V70 and V200 microturbines, renderRender

V70 and V200 microturbines

Microturbines for biogas, commercial buildings and sites without maintenance staff

The V70 (70 kW) and V200 (200 kW) are BluenPower microturbines, integrated in Brazil by Rengia. The compressor, turbine and generator spin on a single shaft on air bearings: no lubricating oil, no coolant and no radiator.

  • V70In assembly and testing
  • V200In development, expected ~2027

Where they pay off most

Biogas on farms and in agro-industry (pigs, poultry, dairy)

Biogas from the digester becomes electricity, and the exhaust heat warms the digester or the barns. Farming accounts for 78% of the biogas plants operating in Brazil.

Sewage treatment plants

Digester gas powers the plant itself, and the heat keeps the digesters warm. Digester gas is the renewable fuel most used by microturbines in this sector.

Small landfills and closed cells

Several units in parallel follow the gas flow, and one can stop without shutting down the others.

Hotels, hospitals and supermarkets

Electricity, hot water and absorption cooling from a single source, quiet and oil-free.

Telecom and remote sites

They run on LPG or natural gas, with remote monitoring over 4G and an inspection every 8,000 h.

Design target

Small data centers

Microturbine blocks with a battery and absorption cooling, in a container, for one or two AI racks.

What decides it

01

Fuel flexibility

Natural gas, biogas, biomethane and LPG are standard. Syngas and ethanol, on request. Biogas treatment (moisture, sulfur, siloxanes) is defined for each site.

02

Minimal maintenance

No oil to change, no coolant and no radiator. Inspection every 8,000 h and overhaul every 5 years.

Design target

03

Low noise and minimal vibration

The shaft turns continuously, with no pistons. Microturbines have less noise and vibration than reciprocating engines.

04

Cogeneration and trigeneration

The exhaust leaves clean, at ~190 °C. It gives ≈ 67 kWth (V70) or ≈ 190 kWth (V200) of recoverable heat, at ≈ 68% total cogeneration efficiency.

Design target

05

Modularity

Several units in parallel, with N+1 redundancy.

06

Low NOx without aftertreatment

Target below 9 ppm NOx (at 15% O₂).

Design target

Distributed energy
2 MW-class module with four containers, roof-mounted recuperator, dry cooler and cooling tower, conceptual 3D modelConceptual 3D model

2 MW CCHP module

The 2 MW module for industry, large buildings, data centers and the grid

A 2 MW-class industrial turbine with an ACTE recuperator, a battery and an absorption chiller, in containers. The module delivers 1.4–1.6 MWe net and, from the same exhaust, cooling and heat.

Design target

Where it pays off most

Industry with steam or heat demand

The heat that would leave through the stack goes into the process. After the recuperator, ~1.7–1.9 MWt is still left above 100 °C for steam or hot water.

Design target

Shopping centres, hospitals and campuses

Absorption cooling (137–333 kW) and heat from the same gas, cutting the grid demand peaks. In a hospital, the module's battery starts it without the grid and carries the load for ~7 min if the turbine stops.

Design target

Data centers

Each module powers 1.12–1.26 MW of IT, and ~1.0 MW of rack heat is rejected without a compressor.

Design target

Microgrids

The module runs islanded, with no grid connection. A grid-forming converter and the battery start the turbine and absorb load steps.

Distribution utilities

Firm capacity and backup at the point of the network that needs reinforcement, with containerised modules installed side by side. Utilities already use gas turbines at substations to add capacity and support the grid.

Large landfills and biogas plants

With the biogas upgraded to biomethane within the network specification. Raw biogas stays with the microturbines, because an industrial turbine is specified for pipeline-quality gas, and the sulfur in biogas forms deposits in the hot parts. To run all year, the module needs the biogas of a large plant, the size class of 8% of Brazil's plants.

estimate

What decides it

01

Firm power on a date

1.4–1.6 MWe per module. From stock in Brazil to switch-on: ~60 days on a ready site; 3–9 months for new orders.

indicative · stock confirmed at order

02

Trigeneration (CCHP)

31–33% electrical efficiency, 36–42% counting the cooling, and up to ~80% when all the heat is used.

Design target

03

Minimal maintenance

More than 40,000 h between major overhauls. Industrial turbines are inspected every 4,000 h and run at 95% availability or higher.

04

Output held in the heat

~1.36 MWe up to 45 °C, because the exhaust heat cools the intake air on hot days.

Design target

05

Minimal vibration and low emissions

The turbine turns continuously, with no pistons, and uses dry low-emission combustion.

06

Fuels

Natural gas from a pipeline or the distribution network, and biomethane within the network specification. Ethanol, on request. Hydrogen: in development, up to 30% hydrogen blend with natural gas.

See the 2 MW module

Genset and turbine, item by item

ItemGenset (gas/diesel)Rengia turbine
Where the usable heat leavesAbout half in the exhaust; the rest in the cooling water and the oil, below ~150 °CConcentrated in a single hot exhaust stream
What the heat producesHot water; steam only at low pressure, below ~8.6 barSteam, hot water, and chilled water by absorption, without a compressor
Oil and filter changesEvery 250–2,000 h, depending on fuel and engineIndustrial turbine: inspection every 4,000 h · V70/V200: no lubricating oil, inspection every 8,000 h*
OverhaulsTop-end overhaul every 8,000–30,000 h, before the major overhaul2 MW module: more than 40,000 h between major overhauls · microturbines: 40,000–80,000 h
NOxCatalyst in the exhaust; SCR where the limit is stricterBelow 15 ppm without treatment (industrial turbine with low-NOx burner) · V70/V200: target below 9 ppm*
Engine coolingRadiator or tower for the jacket water and the oilV70/V200: no coolant, no radiator*
Noise and vibrationPistons in reciprocating motionContinuous rotation, no pistons; V70/V200 with less noise and vibration
Maintenance per kWh (up to ~250 kW)2.2–3.0 US centsMicroturbines: 1.7–1.9 US cents

Category values: US DOE (fact sheets on gas turbines, reciprocating engines and microturbines, 2023–2024) and US EPA (Catalog of CHP Technologies, 2017). *V70/V200 design targets.

Want to compare on your site?

Send the electrical load, the heat and cooling demand, the gas available (natural gas, biogas, LPG) and the address. We point you to the right equipment and run the first analysis with your site's numbers.

Distributed energy