The UFRJ desalination project installation
Completed Water and energy

UFRJ desalination project

Problem
Producing desalinated water from heat that would otherwise be wasted.
What was done
A microturbine runs with an ACTE industrial heat exchanger. Heat from the exhaust gas warms the water used in the desalination process. Rengia commissioned and started up the system.
Team on a site visit to the thermal waste-treatment unitSite visit
In progress Waste and energy

Simões Filho project: waste to power

Problem
Thermal waste treatment produces high-temperature heat that currently goes unused.
What is being done
Study of a solution that turns that heat into electricity, using a high-temperature heat exchanger and a microturbine.
Concept render of an energy-recovery plant with a solar-covered greenhouseRender
In progress Waste and energy

Mitima project: waste-to-energy plant (URE)

Problem
About 40% of Brazil's urban waste still goes to inadequate sites.Source: ABREMA (Dec 2025)
What is being done
An energy recovery unit (URE) that recovers value from municipal solid waste and generates power.
Liquid-cooled rack roomIllustrative image
In progress AI and energy

BluenPower: distributed energy and AI infrastructure

Problem
Data centres are asking for grid connections faster than the grid can grow.
What is being done
Gas-fired generation blocks installed next to the racks, starting with the block built around a 2 MW-class turbine.